  • ROLL Type System L6,500*W2,500*H1,000
  • GRATING Type System L6,500*W2,500*H1,000
Site Preparation 1. Portable Automatic Tire Washer Installation Equipment : Forklift 7Ton or More, Excavator 0.8 ton or More
2. Supplementary Water Work : 1/2B(13mm) PIP or HOSE
3. Electric Entry Construction : Power 20kw 3Ø 380V or 220V, CABLE 660CV 22㎥ × 4C
4. Basic Construction(Digging a Trench, Floor Concrete Casting, Concrete Work on Entrance and Exit)
5. Vinyl Work on the Iron PIT Contact Surface Before Concrete Casting
  • 01 Digging a Trench
  • 02 Digging a Trench
  • 03 Floor Concrete Casting
  • 04 Installing the Portable Automatic Tire Washer
  • 05 Backfilling Work
  • 06 Formation of the Entry and Exit
  • 07 Rebar Placing on the Entry and Exit
  • 08 Concrete Casting on the Entry and Exit
  • 09 Complete Installation and Pilot Operation
DONGSEO PORTABLE AUTOMATIC TIRE

DONGSEO PORTABLE AUTOBATIC TIRE WASHER

CS Center : +82-53-623-2580 / +82-53-638-2580Tel : +82-54-933-8183~4Fax : +82-54-933-8185

Address : 863, Naseon-ro, Seonnam-myeon, Seongju-gun, Gyeongsangbuk-do, Republic of KoreaE-mail : ds2580@korea.com

COPYRIGHT (C) 2018 DONGSEO PORTABLE AUTOMATIC TIRE WASHER. ALL RIGHTS RESERVED.